Before anybody asks what it stocks, or who services it, or what the paperwork says, they ask the question they can actually picture: do we even have space for this?
It is the right first question. An office manager who cannot see the thing against a particular wall cannot argue for it in a meeting, and cannot rule it out either. So the request stalls — not rejected, just never answered.
The frustrating part is that the published answers to this question are genuinely bad. So here is a straight one: what the space has to do, which numbers are real and which are invented, and how to settle it for your building without taking anyone's word for it.
Square footage is the wrong unit. What governs is the length of usable wall, the clearance a person needs standing in front of it, the published accessibility dimensions, and whether a dedicated circuit already exists. Three of those four you can measure yourself this afternoon.
The published numbers do not agree with each other
I went looking for what the industry tells buildings to budget for space, on the assumption there would be a rough consensus to report. There is not.
One operator's space-requirements page says a micro market "typically requires a minimum of 100 to 150 square feet." The same page says a smaller format works "in as little as 50 to 75 square feet," that a typical installation "needs 100-300 square feet," that a standard open-concept build occupies "550 to 600 square feet," and that a premium one runs "600 to 800 square feet." Its own headline advertises flexible solutions "starting at 200 square feet." Those are six different answers on one page, and the headline contradicts the minimum directly beneath it.
Sprinkled between them are claims that a market lifts productivity "by up to 30%" and that layout alone delivers "a 20% boost in sales," each introduced with "research indicates" and neither naming any research. Another operator's fit-out checklist is markedly better — real clearances, real circuit specs — but it is written against one county's code, which does not transfer here.
Read enough of these and the conclusion is not that one range is right. It is that square footage is the wrong unit entirely. A market is not a volume of air. It is a run of equipment against a wall, with people standing in front of it.
Measure the wall, not the floor
Every piece of this sits flat against a vertical surface: cabinets, a payment station, shelving if there is any. So the binding constraint is almost always linear wall, uninterrupted by a door swing, a window sill, a thermostat, a light switch or a fire-alarm pull.
What that means in practice is that two rooms with identical floor area can give completely different answers. A long narrow room with twelve clear feet along one side is excellent. A square room of the same area with doors on three walls and a window on the fourth may have no usable run at all. Floor area cannot tell those two apart, which is exactly why the published ranges are useless to you.
So the measurement worth taking is the longest stretch of clear wall in the room, floor to about five feet up, with nothing fixed in it. Write that number down. Then the depth of clear floor in front of it, from the wall to whatever is opposite — a table edge, a counter, the far wall. Those two numbers settle more than any square-footage figure will.
The clearances are not negotiable, and they are published
This is the part most worth knowing before anyone sketches anything, because accessibility requirements are not a matter of preference and they are freely published by the U.S. Access Board.
For operable parts — a door handle, a touchscreen, a card reader — the standards call for a clear floor space 48 inches long and 30 inches wide minimum (§309.2). Where that space is obstructed on both sides beyond a shallow threshold, the required manoeuvring width goes up to 36 inches. Reach matters too: the unobstructed range runs 15 to 48 inches above the floor (§308.2, §308.3). Reach over an obstruction tightens it — the Access Board's guide states that "the maximum reach of 48″ is reduced to 44″ when the depth of reach over an obstruction exceeds 20″," and a side reach deeper than 10 inches drops the maximum to 46 inches.
And the controls themselves: operable parts "must be usable with one hand" without "tight grasping, pinching, or twisting of the wrist," and must need no more than 5 pounds of force (§309.4). One detail worth not misreading — the standards exempt dedicated receptacles, the kind a refrigerator plugs into, from the operable-parts rules. That exemption covers the outlet. It does not cover the equipment's own door or screen.
Your local authority has the final word on how all of this applies to a particular room, and anyone who tells you otherwise is guessing on your behalf. But a 36-inch walking route past the equipment and a clear 30 by 48 in front of the payment point will keep almost any break room out of trouble.
Power is what actually delays an installation
Of everything on this page, the electrical question is the one most likely to add weeks, and the one most often discovered last.
Refrigeration wants a dedicated 20-amp, 120-volt circuit, and the payment and network hardware generally wants its own, separate from it. The better industry checklists say exactly that, and they also say the thing worth repeating: no extension cords, and outlet height and cord length come from the manufacturer's cut sheets rather than from an assumption. A cooler plugged into a shared circuit alongside a microwave and a kettle is a cooler that will trip a breaker on a Monday morning.
So the useful question to put to your facilities team is narrow and answerable: is there a dedicated 20-amp circuit terminating on that wall, and if not, what would it take to pull one? If the answer is easy, the rest of this is easy. If it is hard, you want to know now rather than after a layout has been agreed.
Where in the building, and where not
Siting decides whether the thing gets used, and the rule is unglamorous: put it on a route people already walk. The break room they use, the corridor between the floor and the exit, the space they pass on the way back from a shift. A market in a room nobody enters does not slowly build an audience; it just sits there.
Two places to avoid. The first is a dead corner — around a blind turn, behind a door, in an alcove off the main path. Visibility is most of what drives use, and a unit people have to remember to detour to is one they stop remembering. The second is any room that runs hot. Refrigerated merchandisers are engineered and tested against a standard room ambient, so a back room that sits well above normal office temperature in August will make the equipment work harder for a worse result. That is a siting decision, not a maintenance problem, and it is much cheaper to get right the first time.
You should not have to trust a range at all
Here is the part that makes every number above less important than it sounds. You do not need to reason from an industry average, because the actual unit can be put in your actual room before anything is ordered.
Send the dimensions you wrote down and a few photographs of the wall, and we place the equipment in that room to scale in augmented reality — the real cabinet, the real footprint, against your own wall, seen from where your people would stand. If it does not fit, you find out in a day, from a picture of your own room, without anyone having to come out and measure. If it does fit, you have something to put in front of whoever has to approve it, which is usually the harder half of the job.
If you want to know whether a market or a cooler suits the building before you get the tape measure out, the headcount tool on the homepage answers that in about a minute, including telling you when the honest answer is not yet. And if you already know the wall you have in mind, send us the room and we will show you it in place.
Nate SkalaFounder and CEO, Skala Industries. Micro markets and AI smart coolers across the Las Vegas Valley.
Begin the process
Tell us about
the building.
We'll tell you within a business day whether we're a fit — including when we're not. A short call is the only next step.
- Response
- Same business day, from Nate.
- Service area today
- The Las Vegas Valley — Las Vegas, Henderson, North Las Vegas, Summerlin, Enterprise, Spring Valley and Paradise.
- Next step
- A short call. We work from your dimensions and photos, and only visit if the site calls for it.
- Timeline
- Four to six weeks from a signed agreement to a stocked market.
- Prefer email?
- support@skalaindustriesllc.com
Thank You for Reaching Out!
Please tell us about your business with the few simple questions in this form, and we'll be in touch to explore how we can work together.